Categories: Science

Transmission lines to carry solar power from Rajasthan to Delhi, other states commissioned for use

<p>
In a landmark development, Government-owned Power Grid Corporation of India has commissioned the transmission lines to carry solar power from Rajasthan to Delhi which will enable the country to fight pollution and climate change as the dependence on coal-fired power  will come down.   </p>
<p>
“POWERGRID Khetri Transmission System Ltd. (PKTSL), a fully owned subsidiary of Power Grid, has commissioned the Transmission System associated with Rajasthan Solar Energy Zone (SEZ) on October 4,” the power ministry said in an official statement on Thursday.</p>
<p>
“Charging of this important transmission project will enhance ease of living as well as provide GatiShakti to infrastructure development activities, through supply of quality and reliable green power across the country,” the power ministry said.</p>
<p>
<strong>Also read:</strong>  <a href="https://www.indianarrative.com/economy-news/amid-coal-shortage-power-minister-holds-meeting-to-take-stock-119604.html">Amid coal shortage, Power Minister holds meeting to take stock</a></p>
<p>
This is one of the largest Inter-State Tariff Based Competitive Bidding (TBCB) projects established in the state of Rajasthan, the statement said.</p>
<p>
The Transmission Project involves a new 765 kV Sub-station at Khetri in Rajasthan and connects the capital of the country at Jhatikara in Delhi through a 765 kV Double Circuit Transmission line and also connects Sikar in Rajasthan through a 400 kV Double Circuit Transmission line.</p>
<p>
The commissioning of PKTSL system will facilitate transfer of Renewable Power from Rajasthan to various parts of the country. It will benefit industries, households and businesses, boosting the economic development of Rajasthan and the country in totality. It will augment the transmission infrastructure to evacuate renewable energy thereby reducing dependency on fossil fuels, in line with Government of India’s vision of achieving 450 GW renewable energy target by 2030.</p>
<p>
POWERGRID presently has 263 Sub-stations and more than 172,000 ckm and 447,000 MVA of transformation capacity. With the adoption of latest technological tools and techniques, enhanced use of automation and digital solutions, POWERGRID has been able to maintain average transmission system availability at over 99%, the official statement added.</p>

IN Bureau

Recent Posts

VINBAX 2024: Vietnam-India bilateral army exercise concludes at Kaushalya Dam

The fifth edition of the historic Indo-Vietnam Joint Field Training Exercise, VINBAX-2024, successfully concluded its…

16 hours ago

India-Russia strengthen defence ties at 22nd Working Group meeting on military technical cooperation

The 22nd meeting of the India-Russia Working Group on Military technical cooperation and defence industry…

16 hours ago

“I want to have strong representation of India at World Nuclear Exhibition 2025”: Sylvie Bermann

Sylvie Bermann, President of the World Nuclear Exhibition expressed confidence in India's nuclear supply chain…

17 hours ago

PoJK: Joint Awami Action Committee protests against government following new ordinance, many injured

Joint Awami Action Committee core member Shaukat Nawaz Mir has condemned the attack of police…

18 hours ago

PM Modi meets 31 world leaders, heads of organisations during his 3-nation foreign visit

Prime Minister Narendra Modi participated in 31 Bilateral Meetings and informal interactions with global leaders…

20 hours ago

India- Australia conduct 11th Indian Air Force-Royal Australian Air Force Air Staff Talks

India and Australia conducted the 11th edition of the Indian Air Force and Royal Australian…

20 hours ago