India

Cabinet approves Rs 6,798 crore projects to boost connectivity, cut logistics costs, and reduce CO2 emissions in 5 years

The Cabinet Committee on Economic Affairs (CCEA) chaired by the Prime Minister Narendra Modi, has approved Two projects of Ministry of Railways with total estimated cost of Rs.6,798 crore (approx.), as per the statement of Cabinet Committee on Economic Affairs (CCEA).

Two approved projects are doubling of Narkatiaganj-Raxaul-Sitamarhi-Darbhanga and Sitamarhi-Muzaffarpur Section covering 256 kms and construction of new line between Errupalem and Namburu via Amaravati covering 57 kms.

The doubling of Narkatiaganj-Raxaul-Sitamarhi-Darbhanga and Sitamarhi-Muzaffarpur Section will strengthen the connectivity to Nepal, North-east India and Border areas and facilitating movement of passenger trains along with goods train resulting in the socio-economic growth of the region.

The new rail line project Errupalem-Amaravati-Namburu traverses through NTR Vijayawada and Guntur districts of Andhra Pradesh and Khammam district of Telangana.

The Two projects covering 8 Districts in 3 States i.e., Andhra Pradesh, Telangana and Bihar will increase the existing network of Indian Railways by about 313 Kms.

New Line project will provide connectivity to about 168 villages and about 12 Lakh population with 9 new stations. Multi-tracking project will enhance connectivity to Two Aspirational Districts (Sitamarhi and Muzaffarpur) serving approx. 388 villages and about 9 lakh population.

These are essential routes for transportation of commodities such as agriculture products, fertilizer, coal, iron ore, steel, cement, etc. The capacity augmentation works will result in additional freight traffic of magnitude 31 MTPA (Million Tonnes Per Annum).

The Railways being environment friendly and energy efficient mode of transportation, will help both in achieving climate goals and minimizing logistics cost of the country, lower CO2 emissions (168 Crore Kg) which is equivalent to plantation of 7 Crore trees.

The new line proposal will provide direct connectivity to “Amaravati” the proposed Capital of Andhra Pradesh and improve mobility for industries and the population, providing enhanced efficiency and service reliability for Indian Railways, as per the CCEA.

The multi-tracking proposal will ease operations and reduce congestion, providing the much-required infrastructural development on the busiest sections across Indian Railways, CCEA added.

The projects are result of PM-Gati Shakti National Master Plan for multi-modal connectivity which have been possible through integrated planning and will provide seamless connectivity for movement of people, goods and services, the CCEA added.

ANI

Ani service

Recent Posts

VINBAX 2024: Vietnam-India bilateral army exercise concludes at Kaushalya Dam

The fifth edition of the historic Indo-Vietnam Joint Field Training Exercise, VINBAX-2024, successfully concluded its…

14 hours ago

India-Russia strengthen defence ties at 22nd Working Group meeting on military technical cooperation

The 22nd meeting of the India-Russia Working Group on Military technical cooperation and defence industry…

14 hours ago

“I want to have strong representation of India at World Nuclear Exhibition 2025”: Sylvie Bermann

Sylvie Bermann, President of the World Nuclear Exhibition expressed confidence in India's nuclear supply chain…

16 hours ago

PoJK: Joint Awami Action Committee protests against government following new ordinance, many injured

Joint Awami Action Committee core member Shaukat Nawaz Mir has condemned the attack of police…

16 hours ago

PM Modi meets 31 world leaders, heads of organisations during his 3-nation foreign visit

Prime Minister Narendra Modi participated in 31 Bilateral Meetings and informal interactions with global leaders…

18 hours ago

India- Australia conduct 11th Indian Air Force-Royal Australian Air Force Air Staff Talks

India and Australia conducted the 11th edition of the Indian Air Force and Royal Australian…

18 hours ago